GraylandWind 2010-3 Friends along the way
|
A secured turbine rotor blade
So it does not blow away overnight
Pad 2 with the big crane in back at pad1 ready to lift first tower base piece
Where perfectly good designed highway trucks and trailers take great risks.
The perils of thousands of miles on one delivery come down to this.
In the last mile, will my $ 500,000.00 equipment and load be destroyed getting in and out of here.
99% of the rigs are never intended to face the stresses of a soft off-highway site like this.
One drop of rain can shut you down or cost of $10,000.00 per minute.
Very professional lift team prepping to put it together