Electrical Windmill base building from ground up.
Excavation-Iron-Concrete-Circuits-Tower-Nacelle-Blades
30 truck loads of concrete for every wind tower
Two trucks on the highway for each on site
70 feet each direction
pouring the pad
pad curing day
pouring the pad
steel rebar reinforcement 4 loads 3 days
The big pour day
non - stop foundation pour with backpack vibrators